Corey and Brad spent the day preparing to tile the bathrooms and floor in the mudroom. They had to build the base for the shower and construct the platform for the whirlpool tub in the master. "Backerboard" was installed in the mudroom and the master bath. They plan to start tiling the master tomorrow.
If you're so inclined, say a little prayer that the kitchen cabinets and the doors and trim will show up soon.
tub

No comments:
Post a Comment